
Water ballast system
HDPE · 6.3 → 120 kg per unit
- Verified at 0.55 kN/m² wind uplift by a CMA/CNAS accredited laboratory
- Zero penetrations — no anchor, no waterproofing repair
- 197 sets per 20GP container
Product range
A purchase order for a PV installation is never one item. Mounting, hardware, earthing, modules, inverters and batteries are bought for the same site and needed on the same day — and every extra supplier is another set of drawings, another packing list and another delay at the port. We quote the list line by line and load it into one container.
Five ways to hold a module down, chosen by roof type, wind load and whether the client will accept ballast. The water ballast system is what we are known for, but it is not the answer on a pitched metal roof or a ground-mount site — so we supply the alternatives as well.

HDPE · 6.3 → 120 kg per unit

HDG steel · ground & roof

Zinc-aluminium-magnesium
Galvanised · no concrete
Mill finish · cut to length
The parts that stop a container, not the parts that win the tender. Small, cheap, and the single most common cause of a stalled installation when one box is missing. We keep the fast-moving items on the shelf.

Aluminium · anodised option
Single-body · rail-less
Export specification
M8 / M10 · slider nuts

Drainage · centre & edge

304 · 30–40 mm range
Earthing is where inspection reports get written. Every item below is the version we actually ship, not a catalogue illustration — the jumpers are pressed onto copper lugs, the earth leads are cut to your length, and the MC4 range carries a 1000 V test report.

Yellow-green · 10 cm
Made to drawing

Tinned copper

1000 V · tested

1000 V / 1500 V

Y / T · solar cable
Outdoor inverters fail from sun and rain long before they fail electrically. These are cut-to-model enclosures rather than universal boxes — send the inverter datasheet and we will match the mounting points and airflow.
Cut to model

SS · braced

Galvanised · folded tray
Galvanised

MC4 crimping set
Everything above the mounting is a brand decision, and it belongs to you. We do not build modules, inverters or batteries — we supply them from the factories already on your approved vendor list, quote them on the same sheet as the hardware, and load them into the same container. One arrival date instead of four is the whole argument.
Monocrystalline · N-type TOPCon
3–110 kW · single & three phase
With or without battery
LFP · 5–100 kWh
One BOM in, one price out
These items are not manufactured by DINGXIU. The brand and model are named on the quotation, and the datasheet and certification pack for that exact model are attached to it.
Ordering
Most of what is on this page has no public price list, because most of it is quoted against a specification. Here is what we need from you, and what you get back.
Mounting, hardware, earthing, modules, inverters, storage — one list, one reply, with stock status against each line.