DINGXIU SOLARDINGXIUSOLARWater ballast solar mounting systems
Technical datasheet
Rev. 1.0 · November 2026
dingxiusolar.com

Water ballast solar mounting system for flat roofs

Non-penetrating ballasted racking. The ballast and the support are one HDPE tank, filled with water on site.

6.3 kgEmpty weight
0 holesNo roof penetration
12 daysPer MW installation
197 setsPer 20GP container

Dimensions & material

MaterialHDPE, blow-moulded, one piece
Empty weightapprox. 6.3 kg
Filled weightapprox. 120 kg (water)
Dimensions L × W × H1450 × 410 × 200 / 310 mm
Cavity volumeapprox. 0.16 m³ per unit
Stacked volume, 2 unitsapprox. 0.32 m³ (≈ 6 sets / m³)
Ballast mediumClean water only — no sand or gravel

System components

Tank bodyHDPE box, ribbed walls, moulded fill port
Middle clampClamps adjacent frames of two modules
End clampClamps outer frame at row ends
BoltClamp to tank, single bolt, hand-tightened
Installed water ballast solar mounting on a flat industrial roof

Design rules

Module orientationPortrait
Bracket positionUnder the seam between modules
Units per rowModules in row + 1
Clamp setsMiddle and end, by frame thickness (end clamps = units × 2)
Mounting tiltapprox. 5°
Module compatibilityAny frame, once clamp size is set

Testing

TestConditionResult
UV ageing1000 h, UVA-340
GB/T 16422.3-2022
8 h light at 60 °C / 4 h condensation at 50 °C × 84 cycles. No cracking, chalking or significant discolouration.
Cold exposure−40 °C × 168 hNo damage, no cracking.
Dry heat105 °C × 200 hNo significant surface defects.
Thermal cycling−40 ↔ +85 °C, 200 cycles
IEC 61215-2:2016 MQT 11
No significant surface defects.
Wind uplift0.55 kN/m² incl. elevated temperature
≈ 30 m/s / 108 km/h
No tearing or failure at the clamp. PASS. Report JTTR-PZ-A-04-003.
Third partyTianjin Bailun, CMA / CNASConclusion PASS. Full report released by email on request.

Ballast weight per unit depends on fill level and on the design wind pressure of the site. A ballast calculation is issued per project — a full cavity is not always required, and is not always sufficient.

HEBEI DINGXIU INTERNATIONAL TRADE CO., LTD. · Hebei, ChinaPage 1 of 2
DINGXIU SOLARDINGXIUSOLARWater ballast solar mounting systems
Application & logistics
Rev. 1.0 · November 2026

Installation sequence

#StepDetail
1Position tanksLay out along the row at module pitch. Empty units are repositioned by hand.
2Place modulesPortrait, dropped onto the seams between adjacent tanks.
3ClampMiddle clamps at seams, end clamps at row edges, one bolt each.
4Fill with waterSite tap or bowser, to the fill level in the project ballast calculation.
5CommissionDC strings and inverter as normal. Roof membrane never penetrated.

Loading reference

LoadingSetsBasis
20GP container197Confirmed loading
40GP container350–36012.03 × 2.35 × 2.39 m internal, 9 layers
40HC container4002.70 m internal height, 10 layers
13 m flatbed truck450Actual loading record
9 m / 6.5 m truck235 / 140Converted at same density

Cargo is volumetric: 400 sets weigh about 2.5 tonnes. Freight should be calculated on CBM, not on weight.

Suitable / not suitable

SuitableFlat concrete and cast-in-place roofs; industrial and warehouse roofs with existing waterproofing; roofs where penetration is forbidden; level ground.
Review firstPitched or curved roofs; light metal roofs without ballast capacity; roofs below the calculated ballast load; sites above the tested wind pressure.

Intellectual property

Structure, nesting geometry and clamp interface are registered under patent 202630294473.0. Counterfeit copies infringe. Test reports and certificate copies are available to buyers on request.

DINGXIU SOLAR
HEBEI DINGXIU INTERNATIONAL TRADE CO., LTD.
East side of Kaiyuan Road, 200 m south of Shuangta, Baita Town, Shahe City, Xingtai, Hebei, China
WhatsApp / WeChat: +86 158 3365 5952
Email: nereosong@dingxiusolar.com · dingxiusolar.com
Send roof area, module model and site location for a layout, unit count and quotation.
Specifications subject to the actual supplied product. Rev. 1.0Page 2 of 2